
Lafarge Canada
Installed 2,000 feet of beam and monorail in Hollow Core plant.
- Designed, Engineered, Fabricated and Installed 2 fully automated Travel buckets, capable of carrying 1 meter of concrete, travels at a speed of 300 feet per minute, 75 trips a day on a 500 foot runway
- Provide Scheduled Maintenance and repairs on all makes and models of overhead hoists, skip hoists, travel buckets
- Installation of Haarup Skip hoists
- Design, Engineer and Machine Crane Components
- Provide Maintenance shift coverage (Millwrights, Welders)
|